Our Projects

CLIENT : SOMA ENTERPRISE LIMITED

Subansiri Lower Hydroelectric Project

Screenshot 2025 07 04 203621 1
Screenshot 2025 07 04 204142 1
WhatsApp Image 2025 06 23 at 4.51.52 PM 2

CLIENT : SPAR GEO INFRA PRIVATE LIMITED

Subansiri Lower Hydroelectric Project

Screenshot 2025 07 05 182209 upscaled
WhatsApp Image 2025 06 23 at 4.51.51 PM 1
WhatsApp Image 2025 06 23 at 4.51.51 PM 2 1

Triple tube core barrel with HX casing for core drilling at the Snow Catch Dam site for avalanche protection. This method ensured accurate core recovery in difficult terrain, aiding in reliable geotechnical analysis and structural planning.

NHIDCL, WEST BENGAL 

WhatsApp Image 2025 06 23 at 4.51.51 PM 3
WhatsApp Image 2025 06 23 at 4.51.51 PM 4
Screenshot 2025 07 04 204432 1

Triple tube core barrel with HX casing was used for precise core drilling at a bridge site and for landslide protection. This method ensures high-quality core recovery, especially in fractured or weathered rock formations, aiding geotechnical assessment.

Trust and Worth

Our Clients